CASE STUDIES

成功案例

REAL RESULTS

Improving Processes and Automation to Raise Capacity and Yield

Yeancheeng does more than make dies; we also work with customers to optimize their processes. Below are our actual results in die layout optimization, material automation, and quality measurement, along with a look at daily production. Every project starts from the customer's pain point, using engineering improvements to deliver substantial gains in capacity and yield. For technical details on any case, please get in touch.

3–5Days

Die Lead Time

±0.02mm

Hole Position Tolerance

0.002–0.003mm

Wire-Cut Four-Pass Precision Trim

300–500K

Guaranteed Punching Cycles

ALL CASES

Case Studies & Live Production Floor

Traditional Die Layout Optimization

Capacity +20% · Die Improvement

Traditional Die Layout Optimization

Overcoming the limits of traditional dense layouts and insufficient structural strength, we have successfully integrated two individual 1,000+ cavity molds into a single, high-performance unit. This innovation boosts the total cavity count to over 2,500, significantly enhancing production efficiency.

Holes →2,500+ · Capacity up 20%+

Automated Switch from Sheet to Coil Material

Automation · Material Improvement

Automated Switch from Sheet to Coil Material

Previously, sheet material was prepared manually. Automated machines were introduced to switch to roll-fed production, reducing labor and improving efficiency and yield.

Labor ↓ · Efficiency↑

2.5D Vision Measurement, Full Inspection

Full Inspection · Quality Control

2.5D Vision Measurement, Full Inspection

Every die batch comes with a QA dimensional measurement report to ensure hole position tolerance of ±0.02mm.

Tolerance ±0.02mm · Batch-by-Batch Reports

Cutting Operations

5S · Process in Action

Cutting Operations

Performed in a clean environment, with 5S management implemented to keep quality spotless.

Temperature-Controlled Environment · 5S Management

Air Shower Cleanliness Control

Cleanliness · Process in Action

Air Shower Cleanliness Control

Before entering the work area, personnel pass through an air shower to remove particles, preventing particle contamination from affecting FPC process yield.

Dust Removal Before Entry · Particle Control

Temperature-Controlled Lamination Room

Temperature Control · Process in Action

Temperature-Controlled Lamination Room

A dedicated lamination room controls temperature and humidity to ensure stable bonding quality between adhesives and stiffener materials.

Temperature & Humidity Control · Lamination Quality